Manufacturing resource planning

Manufacturing Resource Planning (MRP II) is defined by APICS as a method for the effective planning of all resources of a manufacturing company. Ideally, it addresses operational planning in units, financial planning in dollars, and has a simulation capability to answer "what-if" questions and extension of closed-loop MRP. This is not exclusively a software function, but a marriage of people skills, dedication to data base accuracy, and computer resources. It is a total company management concept for using human

Manufacturing Resource Planning (or MRP2) - Around 1980, over-frequent changes in sales forecasts, entailing continual readjustments in production, as well as the unsuitability of the parameters fixed by the system, led MRP (Material Requirement Planning) to evolve into a new concept : Manufacturing Resource Planning (e.g. MRP 2)
Manufacturing Resource Planning (or MRP2) - Around 1980, over-frequent changes in sales forecasts, entailing continual readjustments in production, as well as the unsuitability of the parameters fixed by the system, led MRP (Material Requirement Planning) to evolve into a new concept : Manufacturing Resource Planning (e.g. MRP 2)[1]

MRP II is not

Many items on this list can be part of an MRP II, but are not solely what it is.

  • a computer system
  • manufacturing control system
  • inventory reduction plan

Purpose

MRP II integrates many areas of the manufacturing enterprise into a single entity for planning and control purposes, from board level to operative and from five-year plan to individual shop-floor operation. It builds on closed-loop Material Requirements Planning (MRP) by adopting the feedback principle but extending it to additional areas of the enterprise, primarily manufacturing-related.


http://en.wikipedia.org/wiki/MRP_II

Enterprise resource planning

Advantages

In the absence of an ERP system, a large manufacturer may find itself with many software applications that do not talk to each other and do not effectively interface. Tasks that need to interface with one another may involve:

Change how a product is made, in the engineering details, and that is how it will now be made. Effective dates can be used to control when the switch over will occur from an old version to the next one, both the date that some ingredients go into effect, and date that some are discontinued. Part of the change can include labeling to identify version numbers.

Some security features are included within an ERP system to protect against both outsider crime, such as industrial espionage, and insider crime, such as embezzlement. A data tampering scenario might involve a disgruntled employee intentionally modifying prices to below the breakeven point in order to attempt to take down the company, or other sabotage. ERP systems typically provide functionality for implementing internal controls to prevent actions of this kind. ERP vendors are also moving toward better integration with other kinds of information security tools.[4]

Disadvantages

Many problems organizations have with ERP systems are due to inadequate investment in ongoing training for involved personnel, including those implementing and testing changes, as well as a lack of corporate policy protecting the integrity of the data in the ERP systems and how it is used.

Limitations of ERP include:

Success depends on the skill and experience of the workforce, including training about how to make the system work correctly. Many companies cut costs by cutting training budgets. Privately owned small enterprises are often undercapitalized, meaning their ERP system is often operated by personnel with inadequate education in ERP in general, such as APICS foundations, and in the particular ERP vendor package being used.

  • Personnel turnover; companies can employ new managers lacking education in the company's ERP system, proposing changes in business practices that are out of synchronization with the best utilization of the company's selected ERP.
  • Customization of the ERP software is limited. Some customization may involve changing of the ERP software structure which is usually not allowed.
  • Re-engineering of business processes to fit the "industry standard" prescribed by the ERP system may lead to a loss of competitive advantage.
  • ERP systems can be very expensive to install often ranging from 30,000 US Dollars to 500,000,000 US Dollars for multinational companies.
  • ERP vendors can charge sums of money for annual license renewal that is unrelated to the size of the company using the ERP or its profitability.
  • Technical support personnel often give replies to callers that are inappropriate for the caller's corporate structure. Computer security concerns arise, for example when telling a non-programmer how to change a database on the fly, at a company that requires an audit trail of changes so as to meet some regulatory standards.
  • ERPs are often seen as too rigid and too difficult to adapt to the specific workflow and business process of some companies—this is cited as one of the main causes of their failure.
  • Systems can be difficult to use.
  • Systems are too restrictive and do not allow much flexibility in implementation and usage.
  • The system can suffer from the "weakest link" problem—an inefficiency in one department or at one of the partners may affect other participants.
  • Many of the integrated links need high accuracy in other applications to work effectively. A company can achieve minimum standards, then over time "dirty data" will reduce the reliability of some applications.
  • Once a system is established, switching costs are very high for any one of the partners (reducing flexibility and strategic control at the corporate level).
  • The blurring of company boundaries can cause problems in accountability, lines of responsibility, and employee morale.
  • Resistance in sharing sensitive internal information between departments can reduce the effectiveness of the software.
  • Some large organizations may have multiple departments with separate, independent resources, missions, chains-of-command, etc, and consolidation into a single enterprise may yield limited benefits.
  • There are frequent compatibility problems with the various legacy systems of the partners.
  • The system may be over-engineered relative to the actual needs of the customer.

http://en.wikipedia.org/wiki/Enterprise_Resource_Planning

Enterprise resource planning

Best Practices

were also a benefit of implementing an ERP system. When implementing an ERP system, organizations essentially had to choose between customizing the software or modifying their business processes to the "Best Practice" function delivered in the vanilla version of the software.

Typically, the delivery of best practice applies more usefully to large organizations and especially where there is a compliance requirement such as IFRS, Sarbanes-Oxley or Basel II, or where the process is a commodity such as electronic funds transfer. This is because the procedure of capturing and reporting legislative or commodity content can be readily codified within the ERP software, and then replicated with confidence across multiple businesses who have the same business requirement.

Where such a compliance or commodity requirement does not underpin the business process, it can be argued that determining and applying a Best Practice actually erodes competitive advantage by homogenizing the business as compared to everyone else in the industry sector.

Implementation

Because of their wide scope of application within a business, ERP software systems are typically complex and usually impose significant changes on staff work practices.[citation needed] Implementing ERP software is typically not an "in-house" skill, so even smaller projects are more cost effective if specialist ERP implementation consultants are employed.[citation needed] The length of time to implement an ERP system depends on the size of the business, the scope of the change and willingness of the customer to take ownership for the project.[citation needed] A small project (e.g., a company of less than 100 staff) may be planned and delivered within 3-9 months; however, a large, multi-site or multi-country implementation may take years.[citation needed]

To implement ERP systems, companies often seek the help of an ERP vendor or of third-party consulting companies. These firms typically provide three areas of professional services: consulting, customization and support.

Configuration

Configuring an ERP system is largely a matter of balancing the way you want the system to work with the way the system lets you work. Begin by deciding which modules to install, then adjust the system using configuration tables to achieve the best possible fit in working with your company’s processes.

Modules - Most systems are modular simply for the flexibility of implementing some functions but not others. Some common modules, such as finance and accounting are adopted by nearly all companies implementing enterprise systems; others however such as human resource management are not needed by some companies and therefore not adopted. A service company for example will not likely need a module for manufacturing. Other times companies will not adopt a module because they already have their own proprietary system they believe to be superior. Generally speaking the greater number of modules selected, the greater the integration benefits, but also the increase in costs, risks and changes involved.

Configuration Tables – A configuration table enables a company to tailor a particular aspect of the system to the way it chooses to do business. For example, an organization can select the type of inventory accounting – FIFO or LIFO – it will employ or whether it wants to recognize revenue by geographical unit, product line, or distribution channel.

So what happens when the options the system allows just aren’t good enough? At this point a company has two choices, both of which are not ideal. It can re-write some of the enterprise system’s code, or it can continue to use an existing system and build interfaces between it and the new enterprise system. Both options will add time and cost to the implementation process. Additionally they can dilute the system’s integration benefits. The more customized the system becomes the less possible seamless communication becomes between suppliers and customers.

Consulting Services

Consulting team is typically responsible for your initial ERP implementation and subsequent delivery of work to tailor the system beyond "go live". Typically such tailoring includes additional product training; creation of process triggers and workflow; specialist advice to improve how the ERP is used in the business; system optimization; and assistance writing reports, complex data extracts or implementing Business Intelligence.

The consulting team is also responsible for planning and jointly testing the implementation. This is a critical part of the project, and one that is often overlooked.

Consulting for a large ERP project involves three levels: systems architecture, business process consulting (primarily re-engineering) and technical consulting (primarily programming and tool configuration activity). A systems architect designs the overall dataflow for the enterprise including the future dataflow plan. A business consultant studies an organization's current business processes and matches them to the corresponding processes in the ERP system, thus 'configuring' the ERP system to the organization's needs. Technical consulting often involves programming. Most ERP vendors allow modification of their software to suit the business needs of their customer.

For most mid-sized companies, the cost of the implementation will range from around the list price of the ERP user licenses to up to twice this amount (depending on the level of customization required). Large companies, and especially those with multiple sites or countries, will often spend considerably more on the implementation than the cost of the user licenses -- three to five times more is not uncommon for a multi-site implementation.[citation needed]

Customization Services

The Customization is the process of extending or changing how the system works by writing new user interfaces and underlying application code. Such customisations typically reflect local work practices that are not currently in the core routines of the ERP system software.

Examples of such code include early adopter features (e.g., mobility interfaces were uncommon a few years ago and were typically customised) or interfacing to third party applications (this is 'bread and butter' customization for larger implementations as there are typically dozens of ancillary systems that the core ERP software has to interact with). The Professional Services team is also involved during ERP upgrades to ensure that customizations are compatible with the new release. In some cases the functions delivered via a previous customization may have been subsequently incorporated into the core routines of the ERP software, allowing customers to revert back to standard product and retire the customization completely.

Customizing an ERP package can be very expensive and complicated, because many ERP packages are not designed to support customization, so most businesses implement the best practices embedded in the acquired ERP system. Some ERP packages are very generic in their reports and inquiries, such that customization is expected in every implementation. It is important to recognize that for these packages it often makes sense to buy third party plug-ins that interface well with your ERP software rather than reinventing the wheel.

Customization work is usually undertaken as bespoke software development on a time and materials basis. Because of the specialist nature of the customization and the 'one off' aspect of the work, it is common to pay in the order of $200 per hour for this work. Also, in many cases the work delivered as customization is not covered by the ERP vendors Maintenance Agreement, so while there is typically a 90-day warranty against software faults in the custom code, there is no obligation on the ERP vendor to warrant that the code works with the next upgrade or point release of the core product.

One often neglected aspect of customization is the associated documentation. While it can seem like a considerable -- and expensive -- overhead to the customization project, it is critical that someone is responsible for the creation and user testing of the documentation. Without the description on how to use the customisation, the effort is largely wasted as it becomes difficult to train new staff in the work practice that the customization delivers.

Maintenance and Support Services

Once your system has been implemented, the consulting company will typically enter into a Support Agreement to assist your staff to keep the ERP software running in an optimal way. To minimize additional costs and provide more realism into the needs of the units to be affected by ERP (as an added service to customers), the option of creating a committee headed by the consultant using participative management approach during the design stage with the client's heads of departments (no substitutes allowed) to be affected by the changes in ERPs to provide hands on management control requirements planning. This would allow direct long term projections into the client's needs, thus minimizing future conversion patches (at least for the 1st 5 years operation unless there is a corporate-wide organizational structural change involving operational systems) on a more dedicated approach to initial conversion.

A Maintenance Agreement typically provides you rights to all current version patches, and both minor and major releases, and will most likely allow your staff to raise support calls. While there is no standard cost for this type of agreement, they are typically between 15% and 20% of the list price of the ERP user licenses.

Advantages

In the absence of an ERP system, a large manufacturer may find itself with many software applications that do not talk to each other and do not effectively interface. Tasks that need to interface with one another may involve:

Change how a product is made, in the engineering details, and that is how it will now be made. Effective dates can be used to control when the switch over will occur from an old version to the next one, both the date that some ingredients go into effect, and date that some are discontinued. Part of the change can include labeling to identify version numbers.

Some security features are included within an ERP system to protect against both outsider crime, such as industrial espionage, and insider crime, such as embezzlement. A data tampering scenario might involve a disgruntled employee intentionally modifying prices to below the breakeven point in order to attempt to take down the company, or other sabotage. ERP systems typically provide functionality for implementing internal controls to prevent actions of this kind. ERP vendors are also moving toward better integration with other kinds of information security tools.[4]


http://en.wikipedia.org/wiki/Enterprise_Resource_Planning